Field joint coating for cross-country gas pipelines. We work alongside pipeline construction contractors to keep the coating crew moving with the spread, on spec and fully documented.
A dedicated field joint crew that keeps pace with your welding spread, from surface prep through to the final holiday test.
Girth weld joint coating on cross-country gas pipelines, applied to the specified system and manufacturer requirements.
Installation of heat shrinkable sleeves with controlled preheat, application and adhesion checks.
Liquid applied epoxy and polyurethane field joint systems, with DFT monitoring on every joint.
Abrasive blasting and power tool preparation to the specified cleanliness and surface profile.
High voltage holiday detection on completed joints, with defects marked, repaired and retested.
Coating repairs, tie-in joints and road or creek crossings as the job requires.
The same documented sequence on every field joint, so your QA team and the client's inspector see consistent results down the line.
Weld area checked, ambient conditions and dew point recorded.
Blast cleaned to the specified standard and surface profile.
Joint brought to the required temperature for the coating system.
Sleeve or liquid system applied to manufacturer requirements.
Holiday tested, DFT and adhesion checked, results logged.
Project specific ITPs prepared and signed off before work starts.
Temperature, humidity and dew point recorded before every application.
Dry film thickness and adhesion checks to the project specification.
Every completed joint holiday tested before backfill.
Joint by joint records handed over with the as-built package.
Prequalification ready for tier 1 and tier 2 pipeline contractors.
Safety, quality and environmental plans, ITPs and insurances available on request. Sample badges, swap for real certs
Our crews arrive with the plant and equipment to work remote right-of-way, keeping up with the welding spread with minimal support.
Pipeline Coating Services is a specialist field joint coating contractor based in Secret Harbour, Western Australia, working with pipeline construction companies on cross-country gas projects nationwide.
Founded in 2026 by Malcolm, who spent more than 13 years as a coating QA/QC inspector before going back to the tools. We know what the client's inspector checks, so every joint is prepared, coated and recorded to pass first time.
Send through your project details and our team will come back with pricing, crew availability and our prequalification documents.